Send Your RFQ to Synbase Steel
Prefer to send drawings, BOMs or attachment lists by email? sales@synbasesteel.com
Per ASME B31.3 Para 311.2.2, socket weld fittings require a 1/16″ (1.6 mm) initial gap between pipe end and socket bottom before welding to allow for thermal expansion during welding and service. This tool helps verify your gap compliance and diagnose common root crack failure causes.
Reference: ASME B31.3-2020 Para 311.2.2 — Socket weld assembly requirements.